Position:Dynamic news > Project News

Project News

Simao Jianfeng Cement’s 2500t/d Clinker Production Line WHR Project

Date:2013-05-28


This is a 2500t/d cement clinker production line equipped with WHR unit. The project is designed with 2 boilers and 1 turbine. Turbine& generator’s installed power capacity is 5MW.
The project’s construction period is 9 months. And it’s started on 28th May, 2012 and combined to the grid on 6th May. And on 23th May, the project passes the performance index.