Position:Dynamic news > Project News

Project News

Guizhou Sandu Runji Cement 2500t/d Clinker Production Line WHR Project

Date:2013-06-05

This is a 2500t/d cement clinker production line equipped with WHR project in the EPC construction mode. It’s designed with 2 boilers and 1 turbine. Turbine& generator’s installed power can reach 5MW. The construction period is 9months. The project is actually started on 13th, July and connected to the grid on 29th May, 2013. On 2nd March, the project passes the revised performance test.